AWCReadyPrepare a certification →
D-1 (29)operating limitation

FAA Order 8130.2M — Operating Limitation 29

Appendix D · Table D-1 · p. p180

Major changes or alterations: After incorporation of a major change per § 21.93 or major alteration per § 1.1:(a)Notify the responsible Flight Standards office of the change and receive its response in writing. An amended airworthiness certificate and operating limitations may be required (e.g., changing from a piston to a turbine engine).(b)Comply with Phase I operating limitations. Notify the FAA certification office responsible or designee to update the FAA Registry of any changes to the engine or propeller model by contacting an FAA certification office or designee.

Verify it yourself: the eyeball above opens the exact page of Order 8130.2M with this limitation highlighted.

Does this one apply to your aircraft?

AWCReady decides limitation 29 for you — from the aircraft and the 14 CFR 21.191 purpose.

Not every limitation goes on every aircraft. AWCReady gates each one against the airframe’s attributes and certification basis, asks only the questions that matter in plain language, and assembles a review-ready package.

← All 8130.2M operating limitations

This is a free reference reproducing public-domain text from FAA Order 8130.2M (the MOSAIC revision that superseded 8130.2L). AWCReady is not affiliated with or endorsed by the FAA. The limitations an aircraft actually receives are prescribed by the FAA on FAA Form 8130-7 — AWCReady prepares and organizes; the FAA determines every outcome.